Break Free Grand Pacific – Caloundra QLD

Replacement Centralised Hot Water Systems for 3 Buildings – 2014

With the cost of gas substantially increasing and the subsequent running costs of the previous gas based water heating solution becoming a major issue, the Body Corporate Committee at Grand Pacific was after energy efficient and affordable replacement solution.

SUNPAK Projects was able to design and install a heat pump based solution for each building that would provide the reliable supply of hot water to the facility as well as reduce the running costs by an expected 60%-70%.

Each system was designed with a back up electric element heating system to provide redundancy or boost heating capability in times of high demand providing the continuous supply of hot water under all occasions.