Oaks Mews – Brisbane

Oaks Mews contacted Sunpak Projects to work closely with Locality Planning Energy. The Hot Water Project was to replace the old gas Centralised Hot Water system and the 167 apartment hot water meters to provide a reliable and accurate Hot Water Embedded Network solution.

The changeover process was expertly planned to ensure that the facility only lost hot water for the minimal time possible so as not to cause the residents any inconvenience.

All works were completed on schedule and the outcome was that the Oaks Group, and the building’s management, being extremely satisfied with all facets of the process and the outcome.